DiscoverMain Engine Cut OffT+254: Mars Sample Return, Vulcan, NSSL Phase 3 (with Eric Berger)
T+254: Mars Sample Return, Vulcan, NSSL Phase 3 (with Eric Berger)

T+254: Mars Sample Return, Vulcan, NSSL Phase 3 (with Eric Berger)

Update: 2023-07-18
Share

Description

Eric Berger of Ars Technica joins me to talk about the budgetary threat facing Mars Sample Return, the latest issue with ULA’s Vulcan vehicle, and the ongoing tweaks to the National Security Space Launch Program’s Phase 3 architecture.

This episode of Main Engine Cut Off is brought to you by 35 executive producers—Will, Tyler, Ryan, Stealth Julian, Lars from Agile Space, Harrison, Craig from SpaceHappyHour.com, SmallSpark Space Systems, Pat, Theo and Violet, Tim Dodd (the Everyday Astronaut), Kris, Russell, Donald, Matt, Jan, Dawn Aerospace, Steve, Bob, Benjamin, Joel, Joonas, Lee, David, Warren, Frank, Simon, Fred, Chris, The Astrogators at SEE, Pat from KC, and four anonymous—and 833 other supporters.

Topics

The Show

Comments 
In Channel
loading
00:00
00:00
x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

T+254: Mars Sample Return, Vulcan, NSSL Phase 3 (with Eric Berger)

T+254: Mars Sample Return, Vulcan, NSSL Phase 3 (with Eric Berger)

Colangelo Studios, LLC